Construction method×東京テクノ - List of Manufacturers, Suppliers, Companies and Products

Construction method Product List

1~15 item / All 22 items

Displayed results

Ground improvement work ☆ Deep mixing method 'T-column method' * Certification obtained

This is a columnar improvement work of deep mixing treatment made possible by a self-developed stirring device (patent obtained) that enables high quality, low cost, and flexible responsiveness!

The T-column method is a construction technique that involves excavating the ground while injecting cement-based solidifying materials, efficiently mixing and stirring the solidifying materials with the soil using a uniquely developed mixing device, thereby constructing stable, high-quality columns (columnar improved bodies). ■ Japan Building Center Foundation Construction Technology Examination Certification (Building Technology)  BCJ - Examination Certification - 219 ■ NETIS Number KT-150083-A <Features> - Maximum column diameter of 1.60 m and maximum depth of 16 m. It is possible to construct up to the maximum column diameter with a base machine of 0.7 m³ class without using a three-point pile driver. It can accommodate various types of soil, including cohesive soil, sandy soil, and loam, allowing for flexible responses to various road and neighboring conditions. - By using a fully automated plant, the slurry production process can be managed, ensuring stable quality. - In the case of small-scale buildings, a mold core can be created by sampling with a depth mold sampler. There is no need to collect boring cores, which can reduce construction time and costs. *Documents can be downloaded from the related links.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Multi-Drill Method (Equivalent to BG Method)

We will perform cutting, removal, and backfilling suitable for the site! A case of removing PHC piles that could not be completely taken out.

We would like to introduce a case study of underground obstacle removal conducted by our company. In Yokosuka City, Kanagawa Prefecture, we carried out the work using the multi-drilling method (equivalent to BG method). We removed PHC piles that could not be extracted using the pull-out method. Upon receiving notice that extraction was impossible, we promptly commenced work and successfully completed the project. 【Case Overview】 ■ Project Name: Multi-Drilling Method (Equivalent to BG Method) ■ Construction Date: May 12, 2022 ■ Location: Yokosuka City, Kanagawa Prefecture ■ Details: φ1000 GL-25m *For more details, please download the PDF from the related link or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Removal of Subsurface Obstacles March Part 2

Introducing actual underground obstacles! We have a proven track record in various situational sites.

On our website, we introduce case studies of underground obstacle removal. This page features the second installment of our special on underground obstacles removed in March 2022. For more details, please check the related links. We have included images of actual underground obstacles, so please take a look. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (7)

Introducing actual underground obstacles! We select tools according to the situation and carry out the construction.

On our company website, we introduce case studies of underground obstacle removal. This page features Part 7 of our series on removed underground obstacles. For more details, please refer to the related links. We have included images of actual underground obstacles, so please take a look. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] New Warehouse Construction Using T-Column Method

Carefully planned and constructed to match the building! Introducing examples from the construction site of a new warehouse.

We would like to introduce a case study of the ground improvement work we conducted. At the site of a new warehouse construction in Chigasaki City, Kanagawa Prefecture, we implemented our original deep mixing method and T-column method. The improvement diameters varied widely, with the largest being Φ1400mm and the smallest Φ800mm, totaling five types. We carefully planned and executed the work to match the building requirements. 【Case Overview】 ■ Project Name: Warehouse New Construction T-Column Method ■ Construction Date: September 30, 2019 ■ Location: Chigasaki City, Kanagawa Prefecture *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Nihonbashi, Chuo Ward, Tokyo T-Column Method (Deep Mixing Method)

We will introduce a case where the T-column method was implemented in a strict and narrow area to improve φ1000.

We would like to introduce a case study of the ground improvement work we conducted. In Nihonbashi, Chuo Ward, Tokyo, we performed the T-column method (deep mixing method) using construction machine S-15. We have introduced this case with images in the related links, so please take a look. 【Case Overview】 ■ Project Name: T-column Method (Deep Mixing Method) in Nihonbashi, Chuo Ward, Tokyo ■ Construction Date: June 5, 2021 ■ Location: Nihonbashi, Chuo Ward, Tokyo *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Ground Improvement using Deep Mixing Method (T-Column Method)

Construction case of columnar improvement work at the ground with 170 piles of diameter Φ160 at 3 locations!

Here is an introduction to a case study of ground improvement work conducted by our company. In Machida City, Tokyo, the columnar improvement work for the newly created Tokiwa Ground within the Obirin Gakuen Machida Campus has begun, utilizing the original method "T-Column Method," which has obtained technical examination certification and is based on deep mixing treatment technology. This project involved columnar improvement work for the ground, special L-shaped retaining walls, and L-shaped retaining walls. 【Case Overview】 ■ Project Name: Ground Improvement using Deep Mixing Treatment (T-Column Method) ■ Construction Date: September 3, 2020 ■ Location: Tokiwa Town, Machida City, Tokyo ■ Details: Pile diameter Φ160, total of 170 piles *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] T Column Method, Odawara City, Kanagawa Prefecture

Introducing a case of ground improvement work conducted in Odawara City, Kanagawa Prefecture on September 30, 2021!

We would like to introduce a case study of ground improvement work conducted by our company. We performed our original deep mixing method, the T-column method (Construction Technology Examination Certification), on the site of a factory located in Odawara City, Kanagawa Prefecture. We have provided images along with this case study in the related links, so please take a look. 【Case Overview】 ■Project Name: T-column Method in Odawara City, Kanagawa Prefecture ■Construction Date: September 30, 2021 ■Location: Odawara City, Kanagawa Prefecture *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Sagamihara City T Column Method (Deep Mixing Method)

Introducing a case where the T-column method (deep mixing treatment method) was implemented using construction machine S-15!

We would like to introduce a case study of the ground improvement work we conducted. In Midori Ward, Sagamihara City, Kanagawa Prefecture, we implemented our original T-column method (deep mixing method) using construction machine S-15. A total of 176 locations were completed successfully. 【Case Overview】 ■ Project Name: Sagamihara City T-Column Method (Deep Mixing Method) ■ Construction Date: October 5, 2021 ■ Location: Midori Ward, Sagamihara City, Kanagawa Prefecture ■ Details: Five types of piles with a small diameter of Φ800mm and a large diameter of Φ1300mm *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] T-Column Method (Deep Mixing Method) in Machida City, Tokyo

Leave your foundation construction work to us! Excavation length of 9.0m, with 120 construction sites as examples.

We would like to introduce a case study of the ground improvement work we conducted. In Machida City, Tokyo, we implemented our original T-column method (deep mixing method). The excavation depth was 9.0 meters, with 120 construction locations, and a silo for the solidifying agent was installed for the work. We have provided images of this case study in the related links, so please take a look. 【Case Overview】 ■ Project Name: T-column Method (Deep Mixing Method) in Machida City, Tokyo ■ Construction Date: October 9, 2021 ■ Location: Machida City, Tokyo *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Multi-Drill Method Equivalent to BG Method

Select from various construction machines!

We would like to introduce a case study of underground obstacle removal conducted by our company. In Tokyo, we carried out construction using a multi-drill method equivalent to the BG method. We removed PHC piles and pine piles with a diameter of 1500 mm and a length of 22 m. We have provided images of this case study in the related link, so please take a look. 【Case Overview】 ■ Project Name: Multi-drill Method Equivalent to BG Method ■ Construction Date: June 10, 2022 ■ Location: Tokyo ■ Details: Diameter 1500 mm, Length 22 m *For more details, please download the PDF from the related link or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Underground Obstacle Removal Method in Tokyo (Equivalent to BG Method)

Original tools developed! Examples of removal using the all-casing crushing method.

We would like to introduce a case study of underground obstacle removal conducted by our company. This project took place in Nakano Ward, Tokyo, using an underground obstacle removal method equivalent to the BG method. It features the SR-45 standard mast specification. Piles that could not be removed using the pull-out method were taken out using the all-casing crushing method. We have provided images of this case study in the related links, so please take a look. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Method (Equivalent to BG Method) ■ Construction Date: May 19, 2022 ■ Location: Nakano Ward, Tokyo ■ Details: SR-45 standard mast specification, depth of 16m *For more details, please download the PDF from the related links or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【施工事例】マルチドリル工法による壁際地中障害撤去

いろいろな地質、地中障害物に対応!壁に接近した施工が可能な事例

当社で行った地中障害撤去の施工事例をご紹介いたします。 東京都大田区にて、マルチドリル工法(BG工法同等)による 壁際地中障害撤去を実施。周辺への影響が少ないので、壁に 接近した施工が可能です。 関連リンクにて、画像付きで本事例をご紹介しておりますので 是非ご覧ください。 【事例概要】 ■工事名:マルチドリル工法(BG工法同等)による壁際地中障害撤去 ■施工日:2022年04月08日 ■所在地:東京都大田区 ■詳細:φ1000、L=2.3m(52本) ※詳しくは関連リンクからPDFダウンロードいただくか、お問い合わせ下さい。

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles - March

We have a track record of construction in various fields! We can cut, remove, and backfill underground obstacles using various methods suitable for the site.

On our company website, we introduce case studies of underground obstacle removal. This page features a special report on underground obstacles removed in March 2022. For more details, please refer to the related links. Our company is capable of cutting, removing, and backfilling underground obstacles using various methods suitable for the site. Please feel free to contact us with your requests. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Removal of Underground Obstacles in Minato Ward & 30m Foundation Pile Driving Work

Feel free to consult us if you are in trouble! Here is an example of a case where we encountered underground obstacles and received a removal request.

We would like to introduce a case of underground obstacle removal conducted by our company in Takanawa, Minato-ku, Tokyo. During the construction using the Aboron method, we encountered an underground obstacle at a depth of 18 meters, which made it impossible to continue the work, leading to a request for removal from our company. Using the multi-drill excavator SR-45, we performed the underground obstacle removal with the multi-drill method, and after the obstacle was removed, we also carried out the installation of the foundation piles for the tower crane, measuring 350×350H. [Case Overview] ■ Project Name: Underground Obstacle Removal & 30m Foundation Pile Installation in Minato-ku ■ Construction Date: March 11, 2020 ■ Location: Takanawa, Minato-ku, Tokyo *For more details, please download the PDF from the related link or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration